ILLUSTRATIVE SAMPLE

Concrete & Foundation Takeoff: Sample

Concrete is bought by volume, so small dimension changes move the totals. This illustrative sample shows how footings, foundation walls, slabs, reinforcement and formwork can be separated and organized for review before pricing.

Project type
Slab-on-grade building (hypothetical)
Assumed size
80 ft × 40 ft, approx. 3,200 SF
Takeoff focus
Footings, walls, slab, reinforcement, formwork

Project Overview

This example is a hypothetical single-story, slab-on-grade building of about 3,200 square feet, with strip footings around the perimeter, six interior column footings and a four-foot foundation wall. The dimensions are assumed to show how a concrete and foundation takeoff is organized.

A takeoff like this can cover concrete volumes by element, reinforcing steel, formwork contact areas, subbase and vapor barrier, and embedded items such as anchor bolts. What is included depends on what the drawings show and what is agreed for the project.

Scope of Work

These are categories a concrete and foundation takeoff can cover. Actual scope depends on the drawings and the requirements agreed for each project.

  • Strip and spread footings

    Footing volumes from width, depth and length, or from size and count.

  • Foundation walls and piers

    Wall and pier volumes from thickness, height and length.

  • Slab on grade

    Net slab volume from area and thickness, with edge conditions noted.

  • Grade beams

    Beam volumes and lengths where the drawings show them.

  • Reinforcing steel and welded wire mesh

    Bar weights and mesh areas, taken from the reinforcement schedule where one is provided.

  • Concrete formwork

    Form contact areas for footings, walls, piers and beams.

  • Vapor barrier and subbase

    Barrier area and granular base volume under the slab.

  • Pads, steps, curbs and flatwork

    Other concrete items, listed separately when they are in scope.

Sample Quantity Takeoff

Each row shows an item, its assumed dimensions, an example quantity, a unit and a note. The building is hypothetical, and the figures are here to show how a takeoff can be laid out.

Illustrative Sample Data

Illustrative sample quantity takeoff
Trade Description Quantity Unit Notes
Strip footings 24 in. wide × 12 in. deep, perimeter 18 CY 240 LF; net volume, excludes waste
Spread footings 4 ft × 4 ft × 18 in., six interior columns 5 CY Rounded from about 5.3 CY
Foundation walls 8 in. thick × 4 ft high, perimeter 24 CY CY 240 LF; net volume
Concrete piers 16 in. × 16 in. × 3 ft high, six piers 1.2 CY Assumed to sit on the spread footings
Grade beam 12 in. × 24 in., at overhead door opening 3 CY Assumed 40 LF
Slab on grade 4 in. thick 40 CY 3,200 SF; excludes thickened edges and waste
Reinforcing steel #4 and #5 bars, footings, walls, piers and grade beam 1,620 LB About 1,120 LB #4 plus 500 LB #5; excludes laps and ties
Welded wire mesh Slab reinforcement 3,200 SF Gross area; laps and waste not included
Formwork Footings, walls, piers and grade beam, contact area 2,660 SF Footings 480 + walls 1,920 + piers 96 + beam 160 SF, rounded
Vapor barrier Under slab 3,200 SF Gross area; laps not included
Granular subbase 4 in. compacted depth, under slab 40 CY Compacted volume; compaction factor not applied
Anchor bolts At 6 ft on center plus two per corner 40 EA Spacing assumed

Illustrative example quantities for a hypothetical building, shown only to demonstrate the format. They are not measured, verified, bid-ready or construction-ready, and no pricing is shown. Actual quantities depend on structural drawings, dimensions, specifications, reinforcement schedules and the agreed scope

How the Takeoff Is Organized

A concrete and foundation takeoff generally follows the same path from drawings
to summary. This is a general description of the process. It does not mean this hypothetical
example was measured from real plans.

  1. Review drawings and specifications

    Confirm the sheets, scale, sections, details and notes that apply to the concrete scope

  2. Identify the elements

    List footings, walls, piers, slabs, beams and flatwork shown in the documents.

  3. Organize by element or scope

    Group quantities so each element can be priced and scheduled on its own.

  4. Separate volume, steel and forms

    Keep concrete, reinforcement and formwork quantities distinct where required.

  5. Record assumptions and exclusions

    Note waste, overbreak, unclear details and anything left out of scope.

  6. Prepare the summary

    Present a clear quantity summary with units, notes and open questions for review.

Sample Deliverables

These are examples of deliverables an estimating service can provide for a concrete and foundation scope. Actual deliverables depend on what is agreed for each project.

  • Itemized concrete quantity summary

    Concrete volumes listed by element, with units and notes

  • Foundation and footing breakdown

    Footings, walls, piers and beams shown separately for review.

  • Reinforcement quantity schedule

    Bar and mesh quantities, where the drawings include reinforcement.

  • Formwork quantity summary

    Form contact areas grouped by element.

  • Scope notes, assumptions and exclusions

    A clear list of what is included, what was assumed and what needs clarification.

About This Sample

This page shows how a concrete and foundation takeoff can be structured and
presented. The building and quantities are illustrative examples. Quantities for your project are
prepared from your drawings, specifications and scope requirements. This sample should not be
used for purchasing, bidding or construction decisions.

READY TO GET STARTED?

Send Us Your Plans for a Concrete Takeof

Share your foundation and concrete drawings, and we’ll prepare a project-specific takeoff for your estimating needs.